An Application of Period Batch Control Principles and Computational Independent Models for Supporting the Overhaul Process of the Railway Braking Devices
Published 2013-06-30
abstract views: 22 // FULL TEXT ARTICLE (PDF): 0
Keywords
- Overhaul process,
- Planning,
- Period batch control,
- Information system
How to Cite
Copyright (c) 2023 International Journal of Industrial Engineering and Management
This work is licensed under a Creative Commons Attribution 4.0 International License.
Abstract
The overhaul of railway braking devices is a complex process. It relies on many supporting processes such as spare parts production and supplying. In order for the overhaul to proceed smoothly and all the required work tobeaccomplishedefficiently, an appropriate planning system has to be applied. It must be accompanied by good process coordination and integration of all activities. In this paper is presented a case study of the overhaul process, the proposed planning system and integrative information system support.
Article history: Received (15 April 2013.); Revised (20 May 2013); Accepted (27 May 2013)