International Journal of Industrial Engineering and Management

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut ero labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco.

GUIDE FOR AUTHORS SUBMIT MANUSCRIPT
Vol. 4 No. 2 (2013)
Original Research Article

An Application of Period Batch Control Principles and Computational Independent Models for Supporting the Overhaul Process of the Railway Braking Devices

Branislav Stevanov University of Novi Sad, Faculty of Technical Sciences

Bio
Danijela Gračanin University of Novi Sad, Faculty of Technical Sciences

Bio
Igor Kesić University of Novi Sad, Faculty of Technical Sciences

Bio
Sonja Ristić University of Novi Sad, Faculty of Technical Sciences

Bio

Published 2013-06-30

Keywords

  • Overhaul process,
  • Planning,
  • Period batch control,
  • Information system

Abstract

The overhaul of railway braking devices is a complex process. It relies on many supporting processes such as spare parts production and supplying. In order for the overhaul to proceed smoothly and all the required work tobeaccomplishedefficiently, an appropriate planning system has to be applied. It must be accompanied by good process coordination and integration of all activities. In this paper is presented a case study of the overhaul process, the proposed planning system and integrative information system support.

 

Article history: Received (15 April 2013.); Revised (20 May 2013); Accepted (27 May 2013)