International Journal of Industrial Engineering and Management

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut ero labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco.

GUIDE FOR AUTHORS SUBMIT MANUSCRIPT
Vol. 9 No. 1 (2018)
Original Research Article

SMED Methodology Implementation in an Automotive Industry Using a Case Study Method

Tiago Bidarra Department of Electromechanical Engineering Faculty of Engineering / University of Beira Interior

Bio
Radu Godina Department of Electromechanical Engineering Faculty of Engineering / University of Beira Interior

Bio
João C.O. Matias Department of of Economics, Management, Industrial Engineering and Tourism (DEGEIT)/University of Aveiro

Bio
Susana G. Azevedo CEFAGE - Department of Business and Economics, University of Beira Interior

Bio

Published 2018-03-30

Keywords

  • Human Resources,
  • Lean Manufacturing,
  • Setup Time,
  • SMED,
  • Tool Exchange

Abstract

Nowadays is ever more important to reduce superfluous costs at industrial units. Only through such an approach the margin of profit could be increased. The aim of this paper is to demonstrate the contribution of the Single-Minute Exchange of Die (SMED)methodology to reduce setup times in the stamping process of metal components in the automotive industry. A qualitative approach based on a case study is used to demonstrate this contribution. In this case studythe application of the SMED methodology provides considerable gains in terms of setup time reduction (45%) through a better reorganization of the work and arrangements. According to the case studythe application of the SMED methodology should be accompanied by a reorganization of work, training and the implementation of a systematic and effective method of performing of the various operations that are executedatthe enterprise.

 

Article history: Received (27.10.2017); Revised (20.12.2017); Accepted (30.01.2018)