SMED Methodology Implementation in an Automotive Industry Using a Case Study Method
Published 2018-03-30
abstract views: 70 // FULL TEXT ARTICLE (PDF): 0
Keywords
- Human Resources,
- Lean Manufacturing,
- Setup Time,
- SMED,
- Tool Exchange
How to Cite
Copyright (c) 2023 International Journal of Industrial Engineering and Management
This work is licensed under a Creative Commons Attribution 4.0 International License.
Abstract
Nowadays is ever more important to reduce superfluous costs at industrial units. Only through such an approach the margin of profit could be increased. The aim of this paper is to demonstrate the contribution of the Single-Minute Exchange of Die (SMED)methodology to reduce setup times in the stamping process of metal components in the automotive industry. A qualitative approach based on a case study is used to demonstrate this contribution. In this case studythe application of the SMED methodology provides considerable gains in terms of setup time reduction (45%) through a better reorganization of the work and arrangements. According to the case studythe application of the SMED methodology should be accompanied by a reorganization of work, training and the implementation of a systematic and effective method of performing of the various operations that are executedatthe enterprise.
Article history: Received (27.10.2017); Revised (20.12.2017); Accepted (30.01.2018)