Yaghoubi, D., Dorodiyan, M. and Adibi, M. A. (2022) “Time-Cost Estimation Probabilistic Model Using MCS in Quantitative Risk Analysis in BOT Renewable Energy Projects”, International Journal of Industrial Engineering and Management, 13(4), pp. 250–264. doi: 10.24867/IJIEM-2022-4-317.