Süer, G. A., Yang, X., Alhawari, O. I., Santos, J. and Vazquez, R. (2012) “A Genetic Algorithm Approach for Minimizing Total Tardiness in Single Machine Scheduling”, International Journal of Industrial Engineering and Management, 3(3), pp. 163–171. doi: 10.24867/IJIEM-2012-3-120.