Süer, Gürsel A., Xiaozhe Yang, Omar I. Alhawari, Joel Santos, and Ramon Vazquez. 2012. “A Genetic Algorithm Approach for Minimizing Total Tardiness in Single Machine Scheduling”. International Journal of Industrial Engineering and Management 3 (3):163-71. https://doi.org/10.24867/IJIEM-2012-3-120.