Yaghoubi, D., Dorodiyan, M., & Adibi, M. A. (2022). Time-Cost Estimation Probabilistic Model Using MCS in Quantitative Risk Analysis in BOT Renewable Energy Projects. International Journal of Industrial Engineering and Management, 13(4), 250–264. https://doi.org/10.24867/IJIEM-2022-4-317