[1]
Narayan Pattanaik, L. 2021. Simulation Optimization of Manufacturing Takt Time for a Leagile Supply Chain with a De-coupling Point. International Journal of Industrial Engineering and Management. 12, 2 (Jun. 2021), 102–114. DOI:https://doi.org/10.24867/IJIEM-2021-2-280.