[1]
Yaghoubi, D., Dorodiyan, M. and Adibi, M.A. 2022. Time-Cost Estimation Probabilistic Model Using MCS in Quantitative Risk Analysis in BOT Renewable Energy Projects. International Journal of Industrial Engineering and Management. 13, 4 (Dec. 2022), 250–264. DOI:https://doi.org/10.24867/IJIEM-2022-4-317.