[1]
Süer, G.A., Yang, X., Alhawari, O.I., Santos, J. and Vazquez, R. 2012. A Genetic Algorithm Approach for Minimizing Total Tardiness in Single Machine Scheduling. International Journal of Industrial Engineering and Management. 3, 3 (Sep. 2012), 163–171. DOI:https://doi.org/10.24867/IJIEM-2012-3-120.